Dearing Ford Business & Manufacturing Center

Status


  • Now Available

Overview


Transportation


  • Direct access to US Route 29
  • Access to State Routes 711 and 712
  • 25 miles north of Lynchburg Regional Airport

Building


  • Building size: 33,106 sq. ft.
  • Dimensions: Shell Building - 150' X 200'; Office - 24.775' X 121.350'
  • Site acreage: 5.2+ acres

Construction


  • Walls: Pre-engineered metal building with split-face rock
  • Floors: Reinforced concrete
  • Roof: Insulated metal
  • Ceiling Height:30' minimum
  • Column Spacing: 25' X 18.9'
  • Dock Doors: (4) 12' X 12'
  • Sprinkler: End user specs
  • HVAC: End user specs

Zoning

  • M-I

Utilities


  • Power: Southside Electric Cooperative; (2) 25Kv feeders, overhead or underground extensions available. (Utility work to meet user needs)
  • Water: Town of Altavista; 8 " line on site; 300,000 gal. water tank located on Route 712
  • Sewer: Town of Altavista; 8" line on site
  • Gas: Natural Gas available
  • Telecommunications: Telecommunications and fiber optics available
  • Solid waste: Campbell County Landfill - 12 mile north, accepts industrial waste

Designed and Funded


The Dearing Ford Business & Manufacturing Center Virtual Building was designed by Dominion Seven Architects and Hurt & Proffitt, Inc. and funded by Virginia Economic Development Partnership Grants.


Dearing Ford Manufacturing Center
Gigapark Logo